Riparian Forest Restoration and River Bank Protection, Evrotas River, Greece

    Solution ID
    Description of solution
    Summary (Challenges; Objectives)

    "The objective of the LIFE-EnviFriendly project was to demonstrate low cost, nature based solutions that if used by all farmers within a watershed it will improve the water quality of the waters significantly. The NBS used in this case was a riparian forest restoration coupled with a river bank erosion protection. A bank restoration system using large stones following the rivers curvatures to stabilize the bank and the riparian zone from future flood events was designed and constructed. The selection of largestones was made for two reasons: they can alleviate the power of future floods as well as allowing space for fish to spawn. In addition, we planted a riparian forest of 200 poplar trees to decrease nutrient loads due to uptake and enhanced denitrification. In this way, phytoremediation in conjunction with river bank erosion controls can be demonstrated as a combined Nature Based Solution for nutrients pollution. Multi-level wells were installed up- and down-gradient from the poplar trees to determine the changes in groundwater quality."

    Technical characteristics

    For bank restoration, the selection of large (80cm diameter) stones was made for two reasons: they can alleviate the power of future floods as well as allowing space for fish to spawn. The length of the stone hedge was 120m, the width 2.5m at the bottom and 1 m at the top, and the height 3.5m. 120 m of river bank length of an agricultural field was restored near the City of Sparta. The 200 riparian forest trees were planted in two rows about 1.5 m apart and the spacing between them was also 1.5 m.

    Success factors / lessons learnt

    Impact:"The bank erosion was restored using a stone hedge of large boulders and moreover a riparian forest of 200 poplar trees was planted. The collected data from the monitoring of ground water quality allowed for the estimation of the nitrate reduction taking place at the riparian zone. Denitrification was not expected to contribute significantly in the reduction of nitrates due to the relative high dissolved oxygen and redox potential. Therefore the potential reduction is attributed to poplar tree uptake. The nitrate flux reduction was calculated for the length of the riparian zone for two equally divided parts. The water flow was calculated from the piezometric gradient between the wells, and then the difference between the concentrations resulted in the calculation of the flux. On the average, the riparian forest provided a 70% reduction of nitrates in the groundwater. Consequently, phytoremediation in conjunction with river bank erosion controls is suggested as a combined efficient nature based solution, low cost – high gain, for non-point source pollution of nutrients.The Riparian Forest Restoration as a Nature Based Solution, ten years after implementation the river bank was stabilized and the riparian forest was restored and as a result we had:<ul><li>Increase Biodiversity.</li><li>Increase quality and quantity of green and blue infrastructures.</li><li>Improve connectivity and functionality of green and blue infrastructures.</li><li>Carbon sequestration and storage.</li></ul>The benefits from the NBS include improvement in riparian resilience to floods, protection of agriculture, enhanced biodiversity, groundwater quality improvement and adaptation to climate change impacts. This NBS can promoted and “subsidized” by Common Agricultural Policy because it improves the quality of groundwater." The demonstration was work was part of a LIFE05 - EnviFriendly project. EnviFriendly was awarded the Best-of-the-Best Life project award in 2010 (LIFE05ENV/Gr/000245 EE). 

    Limiting factors / lessons learnt

    Limiting factors for transferability:The demonstrated NBS is low cost-high impact solution that can be easily be adapted to other rivers. However, there are significant barriers that prevent wide spread implementation.Policy/Legislation Barriers:<ul><li>Before any action, legislation requires to establish the floodplain of the reach for the 1 in 50 years flood. This means that the farmer should obtain the following studies: topographic, hydrologic, hydraulic studies – erosion control studies –forest restoration study – environmental impacts study.</li><li>The studies are approved and permits should be obtained from the Municipality, the Region (three Departments – water, environment and forestry), the Ministry of Environment</li></ul>Financial Barriers – who pays the bill? The cost for every 100 m restoration is about 10000 €, however, at least another 10000 € for the floodplain study and the permits.Technological Barriers– who decides which technology to use? Rip-Rap vs Rip-Rap and riparian forest."

    Location Latitude
    37.0692000000
    Location Longitude
    22.4483000000
    Comment on location

    Evrotas River Basin is a predominantly rural river that has intensive water quantity and quality problems due to over utilization of the water for irrigation and intense agricultural pollution.

    Keywords
    Ecosystem (s) impacted
    Cropland
    Hazard(s) concerned
    Erosion
    Other challenges
    Biodiversity
    Other keyword
    erosion
    Exposition
    Exposed assets
    Agriculture
    Activity
    Are there jobs created in the nature-based sector?
    Don't know
    Are there new employments in tourism sector, sport activities or recreational activites ?
    Don't know
    Are there new activities in the tourism sector , sport activities or recreational activites?
    Don't know
    International classification
    Sendai Frameword priorities addressed
    Priority 3. Investing in disaster risk reduction for resilience
    Actors
    Who are the beneficiaries of the action
    Prefecture of Laconia
    Contact person
    Nikolaos P. Nikolaidis and the HersLab team Technical University of Crete, School of Environmental Engineering, Chania Greece
    Organizations involved in the implementation of the action

    The stakeholders involved were: The Prefecture of Laconia, The 9 Municipalities within the Evrotas River Basin, Farmers organizations

    Others
    Is it possible to transpose this action in a different context?
    Yes, it is easily transposable
    References

    Nikolaidis, N.P., F. Stamati, D. Moraetis, 2008. Impact of phytoremediation and bank erosion control in the minimization of nitrate loads to the river. Technical report 68pp +Index 4pp. In: Nikolaidis N., N. Kalogerakis, N.Skoulikidis, K. Tsakiris, (Eds), 2005-2009. Environmental friendly technologies for rural development. Life-Environment project, LIFE05ENV/Gr/000245 EE (Envi-Friendly). http://www.envifriendly.tuc.gr/en/progr.php?allid=1 Demetropoulou, L., N.P. Nikolaidis, V. Papadoulakis, K. Tsakiris, Th. Koussouris, N. Kalogerakis, K. Koukaras, A. Chatzinikolaou and K. Theodoropoulos, 2010. Water Framework Directive implementation in Greece: moving towards participatory governance – the case of the Evrotas River Basin Management Plan, Environmental Governance and Policy, 20, 336-349