ecological development Lauben

    Solution ID
    Description of solution
    Summary (Challenges; Objectives)

    In order to be able to implement the measures for the implementation of the EU Water Framewor Directive and to achieve an ecological improvement along the Günz a water development concept was drawn up. The main objectives are to restore the linear passability of watercourses, to enable self-dynamic development of the river, to improve the structure of the water body and to re-establish the connection of the Günz with the floodplain.The project area is located directly at the confluence of the western and eastern Günz rivers. The measures are located on a compensation area of the Federal Republic of Germany. At the confluence of the Western and Eastern Günz, the course of the Eastern Günz will be lengthened and structures will be created by flattening the banks. At low water, the river concentrates on a small channel. In addition, the theory of the Instream River Training is applied. This means special ramp construction methods in the river bed are used to produce secondary flows. In this way, the river bed and the bank can be stabilized. In addition woods (especially willows) are planted  to prevent erosion. The use of armourstones is avoided as far as possible.

    Location Latitude
    48.0649000000
    Location Longitude
    10.3012000000
    Comment on location

    Lauben

    Keywords
    Ecosystem (s) impacted
    Riverfront
    Hazard(s) concerned
    Erosion
    Other challenges
    Biodiversity
    Exposition
    Exposed assets
    I don’t know
    Is there population exposed?
    No
    Activity
    Are there jobs created in the nature-based sector?
    Don't know
    Are there new employments in tourism sector, sport activities or recreational activites ?
    Don't know
    Are there new activities in the tourism sector , sport activities or recreational activites?
    Don't know
    Are there new/traditional activities that increased?
    I don't know
    International classification
    Sustainable development goals addressed
    SDG 14 – Life below water
    Actors
    Organizations involved in the implementation of the action

    water authority Kempten, Federal Republic of Germany, Free State of Bavaria, Autobahndirektion Süd

    Temporal aspects
    Design life time of the action
    More than 10 years
    Implementation time of the action
    Less than 2 years
    Financial aspects
    Financing source
    79 % Federal government, 21 % Free State of Bavaria
    Others
    Participatory process
    No
    Is it possible to transpose this action in a different context?
    No, it is site specific
    Risk reduction
    Hazard
    ?
    Exposure
    ?
    Vulnerability
    ?
    Feasibility
    Technical Feasibility
    +/-
    Economic Feasibility
    +/-
    Environment
    Water
    0
    Soil
    0
    Vegetation
    +
    Landscape
    +
    Biodiversity
    +
    Society
    Quality of Life
    0
    Community involvement
    0
    Landscape Heritage
    0
    Economy
    Revitalization
    0
    Local Economy
    0