Informations
Solution ID
Description of solution
In the course of the extension of the flood protection, the Ostrach was also expanded and ugraded ecologically. The river bed was widened, as far as the existing local utilization conditions allowed it. All exisiting drop structures were replaced with river bed ramps to improve the ecological passability. Groynes and large stones were implemented to improve the flow diversity.
2 km river widening
Keywords
Exposition
Activity
International classification
Actors
water authority Kempten, Planning community Hochwasserschutz Ostrach (consisting of Regierungsbaumeister Schlegel GmbH & Co. KG, Schneider & Theisen GmbH Ingenieurbüro für Bauwesen, Arnold Consult AG and aquasoli Ingenieurbüro), Dr. Ebel & Co. Ingenieurgesellschacft für Geotechnik und Wasserwirtschaft mbH, Ingenieur- und Sachverständigenbüro für Bauwesen Dipl.-Ing. (FH) Peter Ungethüm GmbH, LGA Landesgewerbeanstalt Bayern and Dipl. Ing. Norbert Nieder, Monika und Armin Socher SigeKo GbR, Hubert Schmid Bauuntrnehmen GmbH, Geiger Hoch- und Tiefbau GmbH & Co. KG, Dobler GmbH & Co. KG, Brutscher GmbH & Co. KG, IBS Technics GmbH, Siegfried Kiffer GmbH
Sonthofen